NYC DOB record · B01274421-S2

3116 Avenue I

3116 Avenue I, Brooklyn, NY 11210

New building filing in Flatlands, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01274421-S2

3116 Avenue I

Brooklyn, NY 11210

New building · status dated Sep 14, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01274421-S2 as a new building at 3116 Avenue I, Brooklyn, NY 11210. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 84 filings that name Askon Architects, P.C.
FiledMay 29, 2026
Current recordApproved
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Filing for plumbing work f a new one family, two story residence

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 1925, on a 2,000 sq ft lot.

Built
1925
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R4
Lot area
2,000 sq ft
Building area
1,440 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 5 notices on file; the most recent was issued Mar 29, 2024.

  • Construction

    Issued Mar 29, 2024 — FAILURE TO MAINTAIN BUIDLIGN IN CODE COMPLIANT MANNER. AT TIMEOF INSPE CTION OBSERVED ROTTED OPEN ROOF, 2ND FLOOR COLLAPSED ONTO 1ST FLOOR , EXP.#2 WALL BOWING. REMEDY/REQUIREMENTS : OWNER TO HIRE NYSPE TO SUBMI T REPORT TO ERTINSPECTIONS @ BUILDINGS.NYC.GOV WITHIN 5 DAYS ADDRESSIN G ALL CONDITIONS WITH PLANS, PHOTOS, RECOMENDING TIME FRAME & REPAIRS

  • Construction

    Issued Nov 14, 2023 — AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED. AT EXP#1 STORM WATER GUTTERS DISPLACED AND HANGING. VACATE ENTIRE BUILDING.

  • Construction

    Issued Nov 14, 2023 — AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01274421-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01274421-S2
BIN
3207130
BBL
3075950047
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
1