NYC DOB record · M01266578-S1

312 West 43 Street

312 West 43 Street, Manhattan, NY 10036

Alteration filing in Hell's Kitchen, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01266578-S1

312 West 43 Street

Manhattan, NY 10036

Alteration filing · status dated Nov 19, 2026

Current record
Approved
Proposed scale
32 stories
Dwelling units
330
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01266578-S1 as a alteration filing at 312 West 43 Street, Manhattan, NY 10036. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 32 proposed stories and 330 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
32 proposed stories and 330 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1024945Applicant of recordSee the 2 filings that name APD Engineering and Architecture PL
FiledAug 14, 2025
Current recordApproved
Proposed scale32 stories
Recorded cost$200,000

What the filing says

A public-record reading of the proposed work.

Filing herewith mechanical work associated with interior renovation of existing retail space as pe plans. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01266578-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01266578-S1
BBL
1010330025
Review type
Professional Certification
Existing stories
32
Proposed stories
32
Existing dwelling units
330
Proposed dwelling units
330