What the filing says
A public-record reading of the proposed work.
Filing herewith plumbng work associated with interior renovation of existing retail space as pe plans. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01266578-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01266578-S2
- BBL
- 1010330025
- Postal code
- 10036 · 1127 filings
- Review type
- Professional Certification
- Existing stories
- 32
- Proposed stories
- 32
- Existing dwelling units
- 330
- Proposed dwelling units
- 330








