What the filing says
A public-record reading of the proposed work.
Scope of work entails the combination and renovation of apartments 2A and 2B, including new washer, replacement of existing plumbing fixtures and removal of existing plumbing fixtures. All completed with associated accessories, insulation and controls.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1920, with 60 homes, on a 12,770 sq ft lot.
- Built
- 1920
- Last altered
- 1982
- Floors
- 6
- Residential units
- 60
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 12,770 sq ft
- Building area
- 54,684 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 22 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Low pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01346434-P1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01346434-P1
- BIN
- 1049812
- BBL
- 1015430009
- Postal code
- 10075 · 573 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 49
- Proposed dwelling units
- 49