What the filing says
A public-record reading of the proposed work.
Proposed interior renovation at existing apartment #16 on the 5th floor as per plans filed herewith. no change to zoning, use, egress, or occupancy. plumbing to be filed subsequently to this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1905, with 45 homes, on a 8,167 sq ft lot.
- Built
- 1905
- Last altered
- 1988
- Floors
- 6
- Residential units
- 45
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R8
- Lot area
- 8,167 sq ft
- Building area
- 32,961 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Nov 28, 2016.
- Construction
Issued Nov 28, 2016 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE. REMEDY: IMMEDIATELY RETAIN A LIC. DESIGN PROFESSIONAL AND PROVIDE ENGINEERING ASSESMENT TO R/W UNIT BY 12/12/2016
- Construction
Issued Feb 11, 2016 — FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD, PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REMEDY: REQUIRE LICENSED DESIGN PROF. TO EVALUATE RETAINING WALL AND SUBMIT REPORT TO FEU BY 6/6/16. CONSTRUCT NEW RETAINING WALL TO BE DESIGNED BY LICENSED DESIGN PROF. WORK TO START NO LATER THAN 10/26/16
- Electric
Issued Dec 20, 1990
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01334819-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01334819-I1
- BIN
- 1059856
- BBL
- 1019930088
- Postal code
- 10027 · 333 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 22
- Proposed dwelling units
- 22








