What the filing says
A public-record reading of the proposed work.
Interior demolition and installation of non-bearing partitions and relocated assembly seating. no change to use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1920, with 8 homes, on a 5,021 sq ft lot.
- Built
- 1920
- Floors
- 3
- Residential units
- 8
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2
- Lot area
- 5,021 sq ft
- Building area
- 11,424 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 12 notices on file; the most recent was issued May 15, 2014.
- Low pressure boiler
Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Feb 27, 2001
- Local law 62/91 - boilers
Issued Feb 7, 2000
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01434901-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01434901-I1
- BIN
- 1080880
- BBL
- 1010350042
- Postal code
- 10036 · 628 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 15
- Proposed dwelling units
- 15