What the filing says
A public-record reading of the proposed work.
Application to repair/replace parapet including vertical crack, step cracks and mortar missing as per plan to comply ecb violation 39157905n & DOB violation. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1924, on a 3,000 sq ft lot.
- Built
- 1924
- Floors
- 3
- Residential units
- 2
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-2A
- Lot area
- 3,000 sq ft
- Building area
- 8,208 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Nov 17, 2025.
- Construction
Issued Nov 17, 2025 — FTC W/COMMISSIONER'S ORDER#347878(091825PI40103TC DATED 09/18/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 10/18/25&START BLDG REPAIRS UNDER PERMIT BY 11/17/25&COMPLETED/SIGNED OFF BY 12/17/25 AS OF 11/17/25 A REVISE CAP WAS NOT SUBMITTED FOLLWOING DOB REJECTION COMPLY W/COMMISSIONER'S ORDER#347878(091825PI40103TC)TO PROV A CAP
- Construction
Issued Sep 18, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD STEP CRACK @ PARAPET LEVEL OF EXP1 NEAR 1/4 CORNER. OBSVS VERT CRACK IN CENTER OF PARAPET. OWNER TO IMMED RETAIN RDP TO EVAL ENTIRE BLDG AND SUBMIT CORRECTIVE ACTION PLAN BY ADDRESSING ALL CONDITIONS. BLDG TO REPAIRED UNDER PERMIT STARTING 11/17/25 AND COMPLETED/SIGNED OFF BY 12/17/25
- Construction
Issued Sep 18, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD MISSING MORTAR AND CRACKS IN PARAPET AT EXP1 AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D SUBMIT ANNUAL PARAPET OBSERVATION REPORT TO BE REC'D BY DOB NO LATER THAN 10/2/25
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01303224-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01303224-I1
- BIN
- 4008329
- BBL
- 4006120037
- Postal code
- 11106 · 266 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2