NYC DOB record · Q01428829-S2

32-53 80 Street

32-53 80 Street, Queens, NY 11370

Alteration filing in Jackson Heights, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01428829-S2

32-53 80 Street

Queens, NY 11370

Alteration filing · status dated Nov 5, 2026

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01428829-S2 as a alteration filing at 32-53 80 Street, Queens, NY 11370. Its latest published status category is Recorded as completed, dated Nov 5, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 5, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4026906Applicant of recordSee the 142 filings that name Aaron Mcdonald Architect
FiledAug 10, 2026
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Remove plumbing and gas fixtures in cellar floor of exist 2 stories residential building. plumbing work as per plan. no change in egress, use, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1930, with 3 homes, on a 2,200 sq ft lot.

Built
1930
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R4
Lot area
2,200 sq ft
Building area
1,782 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 1, 2023.

  • Construction

    Issued Aug 1, 2023 — WORK WITHOUT A PERMIT. NOTED AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITION WALLS FOR 3 ROOMS WITH DOORS. INSTALLED WATER & WASTE LINES FOR 3-PC BATHROOM(SINK,TOILET,SHOWER). INSTALLED ILLEGAL GAS LINE FOR GAS STOVE. INSTALLED ELECTRICAL WIRING FOR SWITCHES, SOCKETS& ELECTRICAL FIXTURES.

  • Construction

    Issued Aug 1, 2023 — RESIDENCE CONVERTED FROM A LEGAL 2 FAMILY TO 3 FAMILY AT CELLAR LEVEL. DOB RECORDS INDICATES PREMISES AS A 2 FAMILY. NOW CONVERTED TO A 3 FAMILY BY CREATING A FULL CLASS A APT AT CELLAR LEVEL WITH FULL KITCHEN WITH GAS STOVE, 3 PC BATHROOM, 3 SEPARATE ROOMS WITH DOORS & LIVING AREA. VACATE ORDER ISSUED AT CELLAR.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01428829-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01428829-S2
BBL
4011760049
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2