What the filing says
A public-record reading of the proposed work.
General construction work on the 27th construction floor (28th marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 36-story office building built in 1987, on a 42,176 sq ft lot.
- Built
- 1987
- Last altered
- 2008
- Floors
- 36
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-9
- Lot area
- 42,176 sq ft
- Building area
- 973,587 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 297 notices on file; the most recent was issued Sep 3, 2019.
- Sprinkler
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
- No report and / or late filing (facade)
Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01446956-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01446956-I1
- BBL
- 1000350001
- Postal code
- 10005 · 123 filings
- Review type
- Professional Certification
- Existing stories
- 36
- Proposed stories
- 36
- Existing dwelling units
- 0
- Proposed dwelling units
- 0