What the filing says
A public-record reading of the proposed work.
Stabilization of demolished building pad.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a utility property on a 307,398 sq ft lot.
- Residential units
- 0
- Building type
- Utility property
- Land use
- Transportation and utility
- Zoning district
- M1-2
- Lot area
- 307,398 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 28 notices on file; the most recent was issued Dec 28, 2018.
- Construction
Issued Dec 28, 2018 — FTM:WAREHOUSE TYPE STRUCTURE WITHA WOOD BOWSTRING TRUSS ROOF RECEIVED ENGINEERING REPORT 3/27/2015 WHICH RECOMMENDS REPAIRS TO THE WOOD BOWSTRING TRUSS ROOF NO JOBS FILED WITH DOB@THAT ADDRESS REMEDY:REPAIR DWGS PREPARED BY LIC PE TO BE FILED WITH DOB NO LATER THAN 2/1/19 WORK UNDER PMT BEGIN NO LATER THAN 2/8/19 WORK COMPLETE&SIGNED OFF 4/1/19
- Construction
Issued Oct 6, 2017 — FTM COND.WAREHOUSE TYPE STRUCT W/WOOD BOWSTRING TRUSS ROOF.WE RECEIVE ENG'R RPT PREP BY STANTEC 3/27/15.RPT RECOMMENDS REPAIR TO WOOD BOW STRING TRUSS ROOF.NO JOBS FILE W/DOB THAT ADRESS THIS RECOMMENDATION REMEDY:REPAIR DWGS PREP BY LIC PE TO BE FILED W/DOB NO LATER 11/3/17 WORK UND PERM BEG NO LATER 11/10/17.SUBSTANT COMP&SIGN OFF BY 12/15/17
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01015912-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01015912-S2
- BIN
- 3395991
- BBL
- 3009680001
- Postal code
- 11215 · 4490 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0