NYC DOB record · Q00796282-I1

320 Beach 100 Street

320 Beach 100 Street, Queens, NY 11694

Alteration filing in Rockaway Beach-Arverne-Edgemere, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00796282-I1

320 Beach 100 Street

Queens, NY 11694

Alteration filing · status dated Sep 8, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
375
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00796282-I1 as a alteration filing at 320 Beach 100 Street, Queens, NY 11694. Its latest published status category is Approved, dated Sep 8, 2026. The filing records 375 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 8, 2026
Proposed scale
375 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 4445407Applicant of recordSee the 511 filings that name Enthink Engineering LLC
FiledAug 22, 2022
Current recordApproved
Proposed scale375 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story elevator apartment building built in 1969, with 376 homes, on a 171,983 sq ft lot.

Built
1969
Floors
13
Residential units
376
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
171,983 sq ft
Building area
485,077 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 110 notices on file; the most recent was issued Oct 4, 2023.

  • Fail to certify class

    Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Hazardous condition (facade)

    Issued Jun 12, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • Construction

    Issued Jun 8, 2022 — PARTIAL VACATE ORDER. OBSERVED BY FACADE INSPECTOR ON 06/07/2022, THERE ARE FACADE DEFECTS AS FOLLOW: CRACKED/SPALLED SLABS @ EXP1(EAST) AND 3(WEST). REMEDY: VACATE ALL BALCONIES AT BOTH TOWERS ENTIRELY AND CHILDREN PLAY AREA LOCATED IN THE COURTYARD BETWEEN BOTH TOWERS

  • 3 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00796282-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00796282-I1
BBL
4161550021
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
375
Proposed dwelling units
375