321 East 43 Street

321 East 43 Street, Manhattan, NY 10017

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01386294-I1

321 East 43 Street

Manhattan, NY 10017

Alteration filing · status dated Sep 18, 2026

Current record
Recorded as completed
Proposed scale
10 stories
Dwelling units
142
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01386294-I1 as a alteration filing at 321 East 43 Street, Manhattan, NY 10017. Its latest published status category is Recorded as completed, dated Sep 18, 2026. The filing records 10 proposed stories and 142 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 18, 2026
Proposed scale
10 proposed stories and 142 proposed dwelling units
Applicant of recordSee the 8 filings that name Architecture Workshop PC
FiledMay 14, 2026
Current recordRecorded as completed
Proposed scale10 stories
Recorded cost$67,500

What the filing says

A public-record reading of the proposed work.

Combination of apt's 801 and 802 as per TPPN 3/1997. Remove and install interior partitions, doors and finishes. Remove one kitchen under separate LAA filing. No change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1928, with 143 homes, on a 12,903 sq ft lot.

Built
1928
Floors
10
Residential units
143
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
12,903 sq ft
Building area
94,516 sq ft
Historic district
Tudor City Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 96 notices on file; the most recent was issued Sep 6, 2019.

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01386294-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01386294-I1
BIN
1038665
BBL
1013360010
Review type
Standard Plan Examination
Existing stories
10
Proposed stories
10
Existing dwelling units
142
Proposed dwelling units
142
General construction