What the filing says
A public-record reading of the proposed work.
Facade repair, includes reconstruction of front parapet wall.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1929, with 7 homes, on a 2,375 sq ft lot.
- Built
- 1929
- Floors
- 3
- Residential units
- 7
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 2,375 sq ft
- Building area
- 5,625 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 17 notices on file; the most recent was issued Jan 29, 2026.
- Construction
Issued Jan 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348024 PLUS 121625PI20706TC DATED 12/16/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/06/2026. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348024 PLUS 121625PI20706TC
- Construction
Issued Dec 16, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD LEANING PARAPET AT EXP1 MASONRY CRACKS AT VARIOUS LOCATIONS AT EXP1OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 1/6/2026 ADDRESSING ALL CONDITIONS W/PLANS,PHOTOS,RECOMMENDING A TIME FRAME & REPAIR TO BE COMPLETED,BLDG T/BE REPAIRED UNDER PERMIT
- Construction
Issued Dec 16, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD PARAPET LEANING INWARD OBSVD MASONRY CRACKS IN PARAPET WALL AT EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS TO BE COMPLETED ANNUALLY STARTING IN 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2024 TO BE REC'D BY DOB NO LATER THAN 12/30/25
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01370857-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01370857-I1
- BIN
- 2018151
- BBL
- 2033430005
- Postal code
- 10467 · 208 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 7
- Proposed dwelling units
- 7