What the filing says
A public-record reading of the proposed work.
Structural work related to the removal and replacement of degraded structural columns, beams, exterior fascia sheathing and waterproofing, instll temp shorng to spprt fl frmng frm ground to underside of 3rdfl brace frnt wall facade as required, per plans
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1990, with 256 homes, on a 607,000 sq ft lot.
- Built
- 1990
- Floors
- 4
- Residential units
- 256
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R3-2
- Lot area
- 607,000 sq ft
- Building area
- 296,644 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 13, 2025.
- Construction
Issued Jun 13, 2025 — FAILURE TO MAINTAIN.SEVERE WATER DAMAGE & RUSTING OF STEEL BEAMS, COLUMNS,& WALL STUDS OBSERVED@FRONT FACADE.EXTERIOR WALL FINISHES APPEAR TO HAVE DETACHED FROM BACKUO WALL.OWNR TO ENGAGE NYS LICENSE PE &CNTRCTR TO RPAIR THE BLDGS UNDER PERMIT BY 8/1/25,SGN OFF BY 9/15/25
- Construction
Issued Jun 13, 2025 — EMERENCY WORK.WATER DAMAGE OF COLD FORMED STEEL STUDS AND STEEL STUDS AND STEEL COLUMNS BEAMS NOTED @ FRONT WALL @ 1ST & 2ND FLOOR. IMMED INSTLL TEMP SHORNG TO SPPRT FL FRMNG FRM GROUND TO UNDERSIDE OF 3RDFL BRACE FRNT WALL FACADE AS REQUIRED
- Construction
Issued Jun 13, 2025 — ADDITIONAL INFORMATION.WATER DAMAGE AND RUSTED STEEL BEAM&COLUMN NOTED @FRONT FACADE.POSSIBLE WATER DAMAGE IN OTHER LOCATIONS.OWNR TO ENGAGE PE TO EVAL ENT STRUCTURES & STRUCTURAL ELEMENTS & TO PROVIDE A COMPREHENSIVE REPORT BY 8/1/2025
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01318320-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01318320-I1
- BIN
- 2124256
- BBL
- 2034327501
- Postal code
- 10473 · 69 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 2
- Proposed dwelling units
- 2