What the filing says
A public-record reading of the proposed work.
Filing for structural facade repairs.work includes stucco removal/replacement, joint seals, flashing, cold-formed steel stud wall repairs, and struct steel beam/column repairs. No change in use/egress/occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1990, with 256 homes, on a 607,000 sq ft lot.
- Built
- 1990
- Floors
- 4
- Residential units
- 256
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R3-2
- Lot area
- 607,000 sq ft
- Building area
- 296,644 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 13, 2025.
- Construction
Issued Jun 13, 2025 — ADDITIONAL INFORMATION.WATER DAMAGE AND RUSTED STEEL BEAM&COLUMN NOTED @FRONT FACADE.POSSIBLE WATER DAMAGE IN OTHER LOCATIONS.OWNR TO ENGAGE PE TO EVAL ENT STRUCTURES & STRUCTURAL ELEMENTS & TO PROVIDE A COMPREHENSIVE REPORT BY 8/1/2025
- Construction
Issued Jun 13, 2025 — FAILURE TO MAINTAIN.SEVERE WATER DAMAGE & RUSTING OF STEEL BEAMS, COLUMNS,& WALL STUDS OBSERVED@FRONT FACADE.EXTERIOR WALL FINISHES APPEAR TO HAVE DETACHED FROM BACKUO WALL.OWNR TO ENGAGE NYS LICENSE PE &CNTRCTR TO RPAIR THE BLDGS UNDER PERMIT BY 8/1/25,SGN OFF BY 9/15/25
- Construction
Issued Jun 13, 2025 — EMERENCY WORK.WATER DAMAGE OF COLD FORMED STEEL STUDS AND STEEL STUDS AND STEEL COLUMNS BEAMS NOTED @ FRONT WALL @ 1ST & 2ND FLOOR. IMMED INSTLL TEMP SHORNG TO SPPRT FL FRMNG FRM GROUND TO UNDERSIDE OF 3RDFL BRACE FRNT WALL FACADE AS REQUIRED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01318320-P1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01318320-P1
- BIN
- 2124256
- BBL
- 2034327501
- Postal code
- 10473 · 207 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 2
- Proposed dwelling units
- 2