NYC DOB record · B00590794-I1

325 Gates Avenue

325 Gates Avenue, Brooklyn, NY 11216

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00590794-I1

325 Gates Avenue

Brooklyn, NY 11216

Alteration filing · status dated Jan 7, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
48
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00590794-I1 as a alteration filing at 325 Gates Avenue, Brooklyn, NY 11216. Its latest published status category is Recorded as completed, dated Jan 7, 2022. The filing records 48 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 7, 2022
Proposed scale
48 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3050817Applicant of recordSee the 325 filings that name Hc Architect, PC
FiledOct 20, 2021
Current recordRecorded as completed
Proposed scale48 units
Recorded cost$1,755

What the filing says

A public-record reading of the proposed work.

Erect illuminated, accessory business channel letter wall sign-a, inside of property line, no change to use, egress or occupation

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 2018, with 48 homes, on a 11,900 sq ft lot.

Built
2018
Last altered
2018
Floors
6
Residential units
48
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
11,900 sq ft
Building area
57,885 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 10 notices on file; the most recent was issued Nov 17, 2025.

  • Construction

    Issued Nov 17, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B00548350-I1 ON 11/13/25. SPECIAL INSPECTOR WITHDRAWAL. STOP ALL FOR JOB # LISTED AND MAKE THE SITE SAFE.

  • Failure to

    Issued Feb 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00590794-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00590794-I1
BBL
3018070001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
48
Proposed dwelling units
48
sign