What the filing says
A public-record reading of the proposed work.
Hereby filing to install a humidifier as shown on plans filed herewith. No change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story condominium built in 2013, with 24 homes, on a 11,149 sq ft lot.
- Built
- 2013
- Floors
- 10
- Residential units
- 24
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- M1-5/R7X
- Lot area
- 11,149 sq ft
- Building area
- 51,013 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 19 notices on file; the most recent was issued Aug 21, 2024.
- Construction
Issued Aug 21, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE AT TIME O F INSPECTION,PREVIOUS VIO 35683682J DATED 7-15-24 WAS NOT CORRECTED.OB SERVED DISLOGED PANELS & UNSECURE PANELS,SCREWS NOT FULLY SCREWED INTO PANELS.OBSERVED MISSING PANELS AT EXP2 AND 3.REMEDY:REPAIR & REPLACE
- Construction
Issued May 22, 2024 — FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES EXPOSURE#2 NORTH AND EXPOSURE#4 SOUTH HAVE LOOSE PARTS NEED IMMEDIATE ATTENTION REMEDY: IMMEDIATELY TAKE CORRECTIVE ACTION TO REPAIR/REPLACE DEFECTIVE FACADE PANELS AS PER 1 RCNY 103-04
- Construction
Issued Mar 12, 2024 — AS PER CONDITIONS ON EXP2 (N ELE) AND EXP4 (S ELE) LOOSE PANELS ON BLDG FACADE. REMEDY: OWNER TO IMMEDIATELY RETAIN A NYS LIC PROF TO PERFORM A 100% HANDS ON INSPECTION OF ALL EXTERIOR PANELS ON THE FACADE & PROVIDE REPAIR PLANT & PROPOSAL SUBMITTED WITH THE ENGINEERS REPORT. REMEDY: TO DOB FACADE UNIT FACADES@BUILDINGS.NYC.GOV BY 421/24
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01442260-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01442260-I1
- BIN
- 1090164
- BBL
- 1002287504
- Postal code
- 10013 · 385 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 18
- Proposed dwelling units
- 18








