NYC DOB record · B01141016-P3

326 Graham Avenue

326 Graham Avenue, Brooklyn, NY 11211

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01141016-P3

326 Graham Avenue

Brooklyn, NY 11211

Alteration filing · status dated Sep 2, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01141016-P3 as a alteration filing at 326 Graham Avenue, Brooklyn, NY 11211. Its latest published status category is Approved, dated Sep 2, 2026. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 2, 2026
Proposed scale
3 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3322922Applicant of recordSee the 6 filings that name James J. Leonard, Architect
FiledAug 3, 2026
Current recordApproved
Proposed scale3 units
Recorded cost$186,000

What the filing says

A public-record reading of the proposed work.

Plumbing work associated with the renovation of an existing four story + cellar three family and one commercial unit. PAA file for plumbing as built conditions; gas stoves & gas dryers replaced with electric stoves and gas dryers,

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1920, with 11 homes, on a 5,000 sq ft lot.

Built
1920
Floors
4
Residential units
11
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
5,000 sq ft
Building area
12,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 8 notices on file; the most recent was issued Jan 13, 2025.

  • Construction

    Issued Jan 13, 2025 — STRUCTURE HAS HAD AN PARTIAL EXTERIOR DEMO ON THE 4TH FLOOR REMOVING A 15FT BY 15FT SECTION OF BRICK FA ADE. WORK IS WITH 5 FEET OF ACTIVE SIDEWALK. WORK HAS LEFT ROOF OPEN AND DESTABILZED SECTION OF BRICK FACADE

  • Construction

    Issued Oct 18, 2010 — FAILURE TO MAINTAIN: AT EXPOSURE #3-LOOSE, UNSECURED BRICKS AT PARAPET DETACHED. FIRE ESCAPE TREAD@ 3RD FLOOR WEATHERED NWOOD WINDOW FRAMES S EPARATED FROM BRICKWOOD. STRESS CRACKS AT WINDOWS AND PARAPET. UNSECUR ED COPING STONE RESTING ON PARAPET WALL. THIS A CLASS 1 VIOLATION

  • Low pressure boiler

    Issued Dec 31, 2009

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01141016-P3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01141016-P3
BBL
3027650001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3
plumbing