What the filing says
A public-record reading of the proposed work.
Alterations to unit 16b. construction of partition walls and installation of new finishes. no change in use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16.5-story condominium built in 1929, with 80 homes, on a 9,464 sq ft lot.
- Built
- 1929
- Floors
- 16.5
- Residential units
- 80
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R10A
- Lot area
- 9,464 sq ft
- Building area
- 101,608 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 78 notices on file; the most recent was issued Jun 16, 2021.
- Construction
Issued Jun 16, 2021 — BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPLICATION #140974051, RE: INTENT TO REVOKE APPROVAL(S) AND PERMIT(S). UNABLE TO DETERMINE % OF WORK COMPLETED. ORDER(S) TO STOP ALL WORK IMMEDIATELY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01445388-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01445388-I1
- BBL
- 1012067501
- Postal code
- 10025 · 594 filings
- Review type
- Standard Plan Examination
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 80
- Proposed dwelling units
- 80