What the filing says
A public-record reading of the proposed work.
Modification to existing VERIZON site. Replace 2 antennas, re-install 2 antennas on new mounts, install 2 additional antennas, replace 4 RRHs, install 2 OVP boxes, relocate 2 GPS units, install 2 GPS units, & install new platform with 3 cabinets on roof
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1900, with 33 homes, on a 4,646 sq ft lot.
- Built
- 1900
- Floors
- 6
- Residential units
- 33
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C1-6A
- Lot area
- 4,646 sq ft
- Building area
- 18,386 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 6 notices on file; the most recent was issued May 26, 2017.
- Construction
Issued May 26, 2017 — DUE TO FIRE
- Construction
Issued Jul 29, 1993
- Construction
Issued Dec 23, 1988
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01342881-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01342881-I1
- BIN
- 1006516
- BBL
- 1004550021
- Postal code
- 10003 · 315 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 33
- Proposed dwelling units
- 33








