What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 31 notices on file; the most recent was issued Sep 17, 2026.
- Construction
Issued Sep 17, 2026 — EMERGENCY WORK ORDER TO INSTALL S/W SHED PROTECTION. IMMED HAZ COND 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTIVE AREAS @ EXP4, CRACKED STONE WORK,DISLODGED STONEWORK,MISSING MORTAR BTWN STONWORK. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL FULLL LENGTH OF BLDG, PROVE APPROX 40FT LINEAR FEET OF SHED AT FRONT SIDE
- Construction
Issued Sep 17, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALLS OF THE BLDG. 24 DEFECTIVE AREAS AT EXP1 & 3, DEFECTS AT EXP4, CRACKED & DISLODGED STONEWORK AT VARIOUS LOCATIONS, MISSING MORTAR BTWN STONE WORK. IMMED RETAIN RDP IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 10/17/26
- Local law 10/81 -
Issued Jun 28, 1993 — 1
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01463349-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01463349-I1
- BIN
- 1078897
- BBL
- 1010430046
- Postal code
- 10019 · 690 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 41
- Proposed dwelling units
- 41