What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed and pipe scaffold shall comply with 2022 NYC building code, chapter 33
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 21-story elevator apartment building built in 2025, with 108 homes, on a 11,990 sq ft lot.
- Built
- 2025
- Floors
- 21
- Residential units
- 108
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-7
- Lot area
- 11,990 sq ft
- Building area
- 166,023 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 9 notices on file; the most recent was issued Feb 11, 2022.
- Construction
Issued Feb 11, 2022 — FTM. THE EXTERIDOR WALLS ARE IN STATE OF DISREPAIR. CRACKOBSERVED @ SOUTHWEST CORNER FROM 3FL TO ROOF. BRICK DISPLACED, CRACKED & SPALLIG STUCCO @ FRONT WEST WALL.OWNER TO ENGAGE A NYSPE & CONTRACTOR TO EVAL & REPAIR BLDG UNDER PERMIT FILE FOR PERMIT BY 4/1/22 START BY BY 4/15/22
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01175312-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01175312-I1
- BIN
- 1053501
- BBL
- 1017230017
- Postal code
- 10027 · 241 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0