NYC DOB record · M01378984-I1

330 East 56 Street

330 East 56 Street, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01378984-I1

330 East 56 Street

Manhattan, NY 10022

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
17 stories
Dwelling units
77
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01378984-I1 as a alteration filing at 330 East 56 Street, Manhattan, NY 10022. Its latest published status category is Approved, dated Sep 17, 2026. The filing records 17 proposed stories and 77 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
17 proposed stories and 77 proposed dwelling units
Applicant of recordSee the 431 filings that name Ashraf Corporation
FiledMar 26, 2026
Current recordApproved
Proposed scale17 stories
Recorded cost$12,000

What the filing says

A public-record reading of the proposed work.

Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story hotel built in 1900, with 76 homes, on a 7,932 sq ft lot.

Built
1900
Last altered
1993
Floors
17
Residential units
76
Building type
Hotel
Land use
Commercial and office
Zoning district
R8
Lot area
7,932 sq ft
Building area
186,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 53 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01378984-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01378984-I1
BIN
1039974
BBL
1013480036
Review type
Professional Certification
Existing stories
17
Proposed stories
17
Existing dwelling units
77
Proposed dwelling units
77
Sidewalk shedScaffolding