What the filing says
A public-record reading of the proposed work.
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story warehouse built in 1924, on a 89,798 sq ft lot.
- Built
- 1924
- Last altered
- 2003
- Floors
- 7
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- M3-1
- Lot area
- 89,798 sq ft
- Building area
- 215,365 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 18 open notices on record for this building, out of 174 notices on file; the most recent was issued Sep 23, 2024.
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Aug 14, 2023 — THE DOB NOTIFY YOU TO REVOKE THE APPROVAL PERMIT# S00310933. THE APPLICANT OF RECORD HAS INFORMED THE DOB THAT HE OR SHE WITHDRAWN FROM THE PROJECT. THERE FOR PURSUANT TO SECTION 28-207.2OF THE ADMIN CODE OF NYC, THE APPROVAL PERMIT# S00310933 REVOKED. STOP ALL WORK UNDER THIS APPLICATION AND MAKE THE SITE SAFE.
- Construction
Issued Aug 14, 2023 — THE DOB NOTIFY YOU TO REVOKE THE APPROVAL PERMIT# S00310933. THE APPLICANT OF RECORD HAS INFORMED THE DOB THAT HE OR SHE WITHDRAWN FROM THE PROJECT. THERE FOR PURSUANT TO SECTION 28-207.2OF THE ADMIN CODE OF NYC, THE APPROVAL PERMIT# S00310933 REVOKED. STOP ALL WORK UNDER THIS APPLICATION AND MAKE THE SITE SAFE.
15 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01268916-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01268916-I1
- BBL
- 5028730034
- Postal code
- 10304 · 124 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 0
- Proposed dwelling units
- 0