NYC DOB record · B00431106-P1

332 21 Street

332 21 Street, Brooklyn, NY 11215

Alteration filing in Sunset Park (West), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00431106-P1

332 21 Street

Brooklyn, NY 11215

Alteration filing · status dated Aug 18, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00431106-P1 as a alteration filing at 332 21 Street, Brooklyn, NY 11215. Its latest published status category is Approved, dated Aug 18, 2021. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 18, 2021
Proposed scale
4 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3017566Applicant of recordSee the 1568 filings that name Paul Perdek, PROF. ENG. PLLC
FiledAug 17, 2021
Current recordApproved
Proposed scale4 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 4 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00431106-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00431106-P1
BBL
3008980025
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4
Scaffolding