What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story garage or fuel station built in 1930, on a 12,771 sq ft lot.
- Built
- 1930
- Floors
- 3
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8B
- Lot area
- 12,771 sq ft
- Building area
- 47,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 34 notices on file; the most recent was issued Dec 28, 2024.
- Construction
Issued Dec 28, 2024 — EWO ON PARKING STRUCTURE CONSIST OF 4 LVLS ABOVE GRADE, OBSERVED CRACK CONCRETE BEAMS & SLABS @ THE FLR W/O SHORING CAUSING A HAZARD TO VEHI- CULAR & PEDTRN TRAFFIC. REMEDY:RETAIN A NYS RDP TO DIRECT & SUPERV THE INSTALLTN OF SAFTY MEAS @ 2 FLR BEAM & PROVIDE SHORING OF FAILED STRUC -TL ELEMENT.RDP PROVIDE REPORT TO PARKINGSTRUCTURE@BUILDING.NYC.GOV
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00931319-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00931319-I1
- BIN
- 1045154
- BBL
- 1014500043
- Postal code
- 10021 · 579 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0