What the filing says
A public-record reading of the proposed work.
Application filed herewith for modification to existing structural as shown on dwgs. Reinforcement of existing foundation, column footings and flooring joists throughout.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story garage or fuel station built in 1905, on a 5,121 sq ft lot.
- Built
- 1905
- Floors
- 5
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R6
- Lot area
- 5,121 sq ft
- Building area
- 24,840 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 21 notices on file; the most recent was issued Aug 4, 2025.
- Construction
Issued Aug 4, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION OBSERVED SPALLING BRICK FACE MULTIPLE LOCATION AT EXP #2 AND 4. REMEDY: REPAIR AND/OR REPLACE
- Elevator
Issued May 25, 2006
- Landmark
Issued May 18, 1989
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00820597-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00820597-I1
- BBL
- 1006330010
- Postal code
- 10014 · 682 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 3