What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1931, on a 1,600 sq ft lot.
- Built
- 1931
- Last altered
- 2016
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R5
- Lot area
- 1,600 sq ft
- Building area
- 3,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Feb 21, 2026.
- Construction
Issued Feb 21, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER; DUE TO FIRE THAT ORIGINATED AT 3322 CHURCH AVENUE CAUSING DAMAGE TO ITS CORNICE THAT WAS PARTIALLY REMOVE. THE REMAINING CORNICE IS PARTIALLY ATTACHED TO 3324 CHURCH AVENUE AND MAY BE COMPROMISED.
- Construction
Issued Feb 21, 2026 — STRUCTURAL RENDERED NON COMPLIANT AT TIME OF INSPECTION BUILDING SUSTA INED EXTENSIVE FIRE , WATER AND SMOKE DAMAGE DUE TO FIRE AT 3322 CHURC H AVENUE. OBSERVED BROKE , MISSING WINDOWS AND SKYLIGHT EXPOSING BUILD ING TO ALL ELEMENTS AMINTIAN BUILDING IN CODE COMPLIANT MANNER
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01468862-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01468862-I1
- BBL
- 3048870010
- Postal code
- 11203 · 1440 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 3
- Proposed dwelling units
- 3