What the filing says
A public-record reading of the proposed work.
Masonry repairs & replacement. no change in egress, use or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1937, with 60 homes, on a 11,500 sq ft lot.
- Built
- 1937
- Floors
- 6
- Residential units
- 60
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 11,500 sq ft
- Building area
- 62,353 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 45 notices on file; the most recent was issued Jun 9, 2026.
- Construction
Issued Jun 9, 2026 — EWO DUE TO CRACKED, SPALLING DISPLACED BRICK MULTI LOC @ EXP 1S (EAST 176 ST) & 4E (FACING E TREMONT AVE) CONDITS POSES IMMINENT HZRD TO THE PBLIC RIGHT OF WAY . REMDY:IMMEDLY TKE/PROVIDE ADEQTE SFTY MEAS TO SECURE/PRTCT PBLIC & INSTALL PBLIC PRTCTN@ EXP 1S & EXP 4E. MAKE IMMEDLY ADEQTE REPAIRS TO DEFCTIVEFACDE CONDITS UNDR SUPRV OF NYS LP
- Construction
Issued Jun 9, 2026 — EMERGENCY WORK ORDER DUE TO CRACKED,SPALLING DISPLACED BRICK MULT LOC @ EXP2 S & EXP4 E. CONDITIONS POSE AN IMMINENT HAZARD TO PUBLIC RIGHT OF WAY & SUBJECT TO POTENTIAL OF FALLING MASONRY.REMEDY:IMMED TAKE/PRO ADEQ SAFE MEAS TO SECURE/PROTECT PUBLIC & INSTALL PUBLIC PROTECTION MAKE REPAIRS TO DEFECTIVE FACADE U/FULL SUPERVISION OF LIC PROFESSIONA
- Construction
Issued Dec 28, 2022 — FAILURE TO PROVIDE DOB APPROVED ENGINEER FOR EMERGENCY REPAIR.
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01441043-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01441043-I1
- BIN
- 2007588
- BBL
- 2028030030
- Postal code
- 10457 · 214 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 60
- Proposed dwelling units
- 60