NYC DOB record · M01486960-S1

335 Bowery

335 Bowery, Manhattan, NY 10003

Alteration filing in East Village, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01486960-S1

335 Bowery

Manhattan, NY 10003

Alteration filing · status dated Nov 23, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
135
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01486960-S1 as a alteration filing at 335 Bowery, Manhattan, NY 10003. Its latest published status category is Approved, dated Nov 23, 2026. The filing records 16 proposed stories and 135 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2026
Proposed scale
16 proposed stories and 135 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1006545Applicant of recordSee the 12 filings that name Mm Architect
FiledNov 19, 2026
Current recordApproved
Proposed scale16 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Installation of Temporary construction wood fence as per plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story hotel built in 2003, with 3 homes, on a 12,204 sq ft lot.

Built
2003
Floors
16
Residential units
3
Building type
Hotel
Land use
Commercial and office
Zoning district
C6-1
Lot area
12,204 sq ft
Building area
90,411 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 65 notices on file; the most recent was issued Aug 19, 2026.

  • Construction

    Issued Aug 19, 2026 — -DUE TO WITHDRAWAL OF APPLICANT , DEPARTMENT OF BUILDINGS ORDERS YOU TO STOP ALL WORK AND JOBS IN CONNECTION WITH APPLICATION #M01222970-I1 IMMEDIATELY.

  • Construction

    Issued Oct 27, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01486960-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01486960-S1
BBL
1004580006
Review type
Professional Certification
Existing stories
16
Proposed stories
16
Existing dwelling units
135
Proposed dwelling units
135