NYC DOB record · M01376293-S3

339 5 Avenue

339 5 Avenue, Manhattan, NY 10016

New building filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01376293-S3

339 5 Avenue

Manhattan, NY 10016

New building · status dated Aug 21, 2026

Current record
Approved
Proposed scale
18 stories
Dwelling units
95
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01376293-S3 as a new building at 339 5 Avenue, Manhattan, NY 10016. Its latest published status category is Approved, dated Aug 21, 2026. The filing records 18 proposed stories and 95 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 21, 2026
Proposed scale
18 proposed stories and 95 proposed dwelling units
FiledJun 18, 2026
Current recordApproved
Proposed scale18 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Provide support of excavation work as per plans filed. Filed subsequent to NB #M01376293-I1.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 5,628 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
C5-2
Lot area
5,628 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 28 notices on file; the most recent was issued Mar 31, 1997.

  • Construction

    Issued Mar 31, 1997

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01376293-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01376293-S3
BIN
1017074
BBL
1008630001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
18
Existing dwelling units
Empty in the source
Proposed dwelling units
95