What the filing says
A public-record reading of the proposed work.
Relocate exisitng (1) kitchen sink and existing (1) dishwasher 3'-6" to the left to new location in the kitchen on the west wall. existing (1) washer unit to remian in same location. no gas work.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 2007, with 23 homes, on a 6,390 sq ft lot.
- Built
- 2007
- Last altered
- 2006
- Floors
- 7
- Residential units
- 23
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 6,390 sq ft
- Building area
- 20,284 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 22 notices on file; the most recent was issued Aug 31, 2026.
- Construction
Issued Aug 31, 2026 — ATOI OBSERVED TEMP SHORING AT BASEMENT PARKING GARAGE , AT MULTIPLE LOCATION
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Elevator annual inspection /
Issued Jun 10, 2015 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01350536-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,995 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01350536-I1
- BBL
- 3050607502
- Postal code
- 11226 · 2380 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 23
- Proposed dwelling units
- 23








