What the filing says
A public-record reading of the proposed work.
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1921, with 10 homes, on a 1,660 sq ft lot.
- Built
- 1921
- Last altered
- 1980
- Floors
- 5
- Residential units
- 10
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 1,660 sq ft
- Building area
- 5,287 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 8 notices on file; the most recent was issued Jul 22, 2025.
- Construction
Issued Jul 22, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD VERT CRACK BEHIND WIRE @ EXP4 OBSVD CRACKS & SPALLING IN CONCRETE PATCHES ON COLUMN @ EXP4. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 8/21/25 ADDRESSING ALL COND.BLDG TO/BE REPAIRED UNDER PERMIT START 9/20/25
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01405646-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01405646-I1
- BIN
- 1046637
- BBL
- 1014920048
- Postal code
- 10028 · 685 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 10
- Proposed dwelling units
- 10