NYC DOB record · B00617548-I1

34 Madison Street

34 Madison Street, Brooklyn, NY 11238

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00617548-I1

34 Madison Street

Brooklyn, NY 11238

Alteration filing · status dated Feb 22, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00617548-I1 as a alteration filing at 34 Madison Street, Brooklyn, NY 11238. Its latest published status category is Recorded as completed, dated Feb 22, 2024. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Feb 22, 2024
Proposed scale
2 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3057155Applicant of recordSee the 203 filings that name Zheng & Associates LLC
FiledDec 22, 2021
Current recordRecorded as completed
Proposed scale2 units
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Plumbing and sprinkler work for proposed two family dwelling units. no change in use, egress and occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story two-family home built in 1930, on a 2,253 sq ft lot.

Built
1930
Last altered
2023
Floors
4
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6B
Lot area
2,253 sq ft
Building area
4,144 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00617548-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00617548-I1
BBL
3019890022
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
2
plumbing