NYC DOB record · B00483062-I1

34 Plaza Street East

34 Plaza Street East, Brooklyn, NY 11238

Alteration filing in Prospect Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00483062-I1

34 Plaza Street East

Brooklyn, NY 11238

Alteration filing · status dated Jan 11, 2022

Current record
Recorded as completed
Proposed scale
12 stories
Dwelling units
111
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00483062-I1 as a alteration filing at 34 Plaza Street East, Brooklyn, NY 11238. Its latest published status category is Recorded as completed, dated Jan 11, 2022. The filing records 12 proposed stories and 111 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 11, 2022
Proposed scale
12 proposed stories and 111 proposed dwelling units
Complete building dossierView all 8 filings associated with BIN 3029314Applicant of recordSee the 6 filings that name Rise Projects
FiledApr 6, 2021
Current recordRecorded as completed
Proposed scale12 stories
Recorded cost$107,796

What the filing says

A public-record reading of the proposed work.

Interior renovation of apt #707 as shown on plans. work includes removal of partitions, appliances, and finishses. installation of new partitions, millwork, finishes, appliances and lighting. there is no change in use, occupancy or means of egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story elevator apartment building built in 1956, with 111 homes, on a 14,673 sq ft lot.

Built
1956
Floors
12
Residential units
111
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8X
Lot area
14,673 sq ft
Building area
120,001 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 43 notices on file; the most recent was issued Oct 4, 2023.

  • Fail to certify class

    Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • 5 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00483062-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00483062-I1
BBL
3011700009
Review type
Standard Plan Examination
Existing stories
12
Proposed stories
12
Existing dwelling units
111
Proposed dwelling units
111
General construction