What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed as shown on drawings. no change in use egress or occupancy. we shall comply with choater 33 of 2022 b.c
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story garage or fuel station built in 1900, on a 7,531 sq ft lot.
- Built
- 1900
- Floors
- 6
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8
- Lot area
- 7,531 sq ft
- Building area
- 41,586 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 18 open notices on record for this building, out of 59 notices on file; the most recent was issued May 22, 2024.
- Construction
Issued May 22, 2024 — FULL(ENTIRE PARK.STRUC.ALL 7FL.)VACATE ORDER. NOTE-INSPECTION OF THIS BUILDING STORY(6+C) (7LEVEL) INDEPENDENT STRUCTURE OBSERVED UNSAFE CONDITION AS PER OPSI FILING. AFTER DOB PLAN EXAMINER REVIEW RECOMME FULL VACATE OF ENTIRE PARKING STRUCTURE. REMEDY, IMMEDIATELY VACATE ENTIRE PARKING STRUCTURE AS PER COMMISIONER ORDER
- Construction
Issued Apr 25, 2024 — EMERGENCY WORK ORDER.NOTE ON AN ACTIVE PARKING STRUCTURE CONSISTING OF 7 LEVELS,OBSERVED:1)GENERAL CRACK THROUGHOUT ON ALL FLOORS.2)SPALLED F ALSE CEILING ON ALL FLOORS AT SEVERAL LOCATIONS.3)STEEL BEAM DAMAGE ON ON THE CEILING LEVEL.REMEDY:OWNER TO RETAIN A NYS REG DESIGN PROFESSIO NAL TO SUPERVISE INSTALLATION OF SAFETY MEASURES.PROVIDE DAILY REPORT
- Failure to correct swarmp conditions (facade)
Issued Apr 27, 2020 — CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
15 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01471025-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01471025-I1
- BIN
- 1040055
- BBL
- 1013510032
- Postal code
- 10022 · 1021 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








