What the filing says
A public-record reading of the proposed work.
Temporary installation of pipe scaffold as per drawings during general construction work . no change in use, egress, and occupancy. pipe scaffold to comply with chapter 33 of the NYC building code of 2022.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1906, with 23 homes, on a 7,151 sq ft lot.
- Built
- 1906
- Last altered
- 2015
- Floors
- 9
- Residential units
- 23
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 7,151 sq ft
- Building area
- 33,893 sq ft
- Historic district
- West End-Collegiate Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 1, 2024.
- Failure to correct swarmp conditions (facade)
Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 13, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued Feb 14, 2023 — FAILURE TO MAINTAIN EXTERIOR WALLS IN A CODE COMPLIANT MANNER OBSERVED HOLES IN CONICE ON EXPOSURE#1 &MISSING WINDOWS ON EXPOSURE#3 IN MULTIPLE LOCATIONS REMEDY:REPAIR OR REPLACE DEFECTIVE CONDITIONS
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01132346-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01132346-I1
- BBL
- 1011830050
- Postal code
- 10023 · 618 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0