What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty overhead protection as per plans in conjunction with general construction work. no change in use, egress or occupancy. overhead protection shall comply with 2022 NYC building code,chapter 33.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1906, with 23 homes, on a 7,151 sq ft lot.
- Built
- 1906
- Last altered
- 2015
- Floors
- 9
- Residential units
- 23
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 7,151 sq ft
- Building area
- 33,893 sq ft
- Historic district
- West End-Collegiate Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 1, 2024.
- Failure to correct swarmp conditions (facade)
Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 13, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued Feb 14, 2023 — FAILURE TO MAINTAIN EXTERIOR WALLS IN A CODE COMPLIANT MANNER OBSERVED HOLES IN CONICE ON EXPOSURE#1 &MISSING WINDOWS ON EXPOSURE#3 IN MULTIPLE LOCATIONS REMEDY:REPAIR OR REPLACE DEFECTIVE CONDITIONS
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01132346-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01132346-S2
- BBL
- 1011830050
- Postal code
- 10023 · 618 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0