What the filing says
A public-record reading of the proposed work.
Installation of a temporarily supported scaffold and site specific engineering enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story hotel built in 1927, on a 7,663 sq ft lot.
- Built
- 1927
- Floors
- 9
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- R8B
- Lot area
- 7,663 sq ft
- Building area
- 51,520 sq ft
- Historic district
- Riverside-West End Historic District Extension I
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 52 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Elevator
Issued Dec 21, 2007
- Local law 10/81 -
Issued Jan 13, 1997
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01281484-P4.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01281484-P4
- BBL
- 1012460049
- Postal code
- 10024 · 267 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 127
- Proposed dwelling units
- 61