What the filing says
A public-record reading of the proposed work.
Material hoist. for material only. no work from hoist.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 21-story elevator apartment building built in 1962, with 401 homes, on a 175,000 sq ft lot.
- Built
- 1962
- Floors
- 21
- Residential units
- 401
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 175,000 sq ft
- Building area
- 345,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 45 open notices on record for this building, out of 234 notices on file; the most recent was issued Jul 27, 2026.
- Construction
Issued Jul 27, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS:DEFECT AT BALCONY SLAB-CEILINGS. CRACKS AT EXP1: 9 AND 12 FLOOR EAST & UPPER FLOORS. ROOF AREA:CRACK AT CHIMNEY, BULKHEAD AND SPALLING, DEFECTED WATER TOWER AT M/C ROOM. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 27, 2026 — FACADES ELEMENT FAILURE/FAILURE TO MAINTAIN:DUE TO LARGE OPEN CRACKS OF CAVITY MASONRY WALL, VERTICAL CRACKS OF CORNER OF 2 WALLS CONNECTIN TO EACH OTHER, STEP CRACKS,DEFECT MORTAR JOINTS MULT LOCS. REMEDY: OWNER IMMED RETAIN SVCS OF NYS RDP W/QEWI CERTIFICATION. TO INSPECT & EVAL 100% ENTIRE CVAITY WALL SYS (HANDS-ON/SOUND WITH PROBE.)
- Construction
Issued Jul 27, 2026 — EMERGENCY WORK ORDER DUE TO WALL SEPARATION AND CRACKING AT EXPOSURE #1 SOUTH ELEVATION. SOUTH ELEVATION. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED AT EXPOSURE #1 SOUTH ELEVATION INCLUDING ENTRANCE UNDER DIRECTION OF LICENSED PROFESSIONAL
42 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01459202-I1.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01459202-I1
- BIN
- 2083678
- BBL
- 2057590573
- Postal code
- 10463 · 236 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source