What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 2019, with 42 homes, on a 13,922 sq ft lot.
- Built
- 2019
- Last altered
- 2015
- Floors
- 7
- Residential units
- 42
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 13,922 sq ft
- Building area
- 40,877 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 14 notices on file; the most recent was issued Jun 30, 2026.
- Construction
Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #031225CFA01 701YC REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y A PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL IMMEDIATELY.AS OF 6 /30/26,NO HANDS ON INSPECTION SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WITH DOB VIOLATION #031225CFA01701YC IMMEDIATELY
- Construction
Issued Mar 12, 2025 — FTM DUE TO OBSRVED UNSF FACDE CONDIT @ EXP2 W.ELEV OBSRVED FALLEN OFF EIFS STUCCO WALL, LOOSE EIFS STUCCO WALL FROM ROOFEDGE TO 6FL. A LARGE PORTION OF EIFS STUCCO WALL ARE MISSING FROM THE EXTER WALL. REMDY: IMMEDLY RETAIN SERVICE OF NYS RDP TO INSPECT/EVALUTE 100% OFHANDS-ON OF UNSF FACDE CONDIT.SUBMIT PHOTO OF CORRCTION & REPRT TO FACADE@B.N.G
- Construction
Issued Mar 18, 2024 — .PARTIAL VACATE ORDER ON 03/12/24 BY A DACADE INSPECTOR THERE IS A LARGED AREA OF EXTERIOR.INSULATION EXISTING INISING SYSTEM WALL FALLIN OFF THESEN
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00235477-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00235477-I1
- BBL
- 3049980004
- Postal code
- 11210 · 1424 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 42
- Proposed dwelling units
- 42