NYC DOB record · M01364461-I1

343 East 22 Street

343 East 22 Street, Manhattan, NY 10010

Alteration filing in Gramercy, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01364461-I1

343 East 22 Street

Manhattan, NY 10010

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01364461-I1 as a alteration filing at 343 East 22 Street, Manhattan, NY 10010. Its latest published status category is Approved, dated Sep 17, 2026. The filing records 5 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
5 proposed stories
Applicant of recordSee the 574 filings that name Fl&m Engineering Design &inspection
FiledFeb 26, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1910, with 8 homes, on a 1,839 sq ft lot.

Built
1910
Floors
5
Residential units
8
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
C1-6A
Lot area
1,839 sq ft
Building area
6,183 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 5 notices on file; the most recent was issued Feb 21, 2026.

  • Construction

    Issued Feb 21, 2026 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY MIXED USE BUILDING. HEAVY SMOKE FIRE AND WATER DAMAGE THROUGHOUT. PARTITION WALLS MISSING,CEILINGS MISSING. WINDOWS MISSING, SKYLIGHT DAMAGED MISSING LEAVING BUILDING OPEN TO WEATHER ELEMENTS, HOLES IN FLOORS DUE

  • Plumbing

    Issued Oct 4, 2018 — THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING JOB #122861572 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT

  • Boiler

    Issued Mar 12, 1990 — 32/38/24A/31A INADEQUATE VENTILATION-INSTALL INLET AND OUTLET SECTION TO OUTDOORS PROPERLY-REPLACE BAROMETRIC DAMPER-FRONT OF BOILER CAP ON PIPE CORRODED-LOW WATER CUT OFF BLOWDOWN VALVE CORRODED/REPLACE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01364461-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01364461-I1
BIN
1020575
BBL
1009280024
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
0
Proposed dwelling units
0
Sidewalk shed