NYC DOB record · M01438934-I1

344 East 34 Street

344 East 34 Street, Manhattan, NY 10016

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01438934-I1

344 East 34 Street

Manhattan, NY 10016

Alteration filing · status dated Nov 17, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01438934-I1 as a alteration filing at 344 East 34 Street, Manhattan, NY 10016. Its latest published status category is Recorded as completed, dated Nov 17, 2026. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 17, 2026
Proposed scale
4 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1081681Applicant of recordSee the 31 filings that name Azarkian Architecture P.C.
FiledSep 1, 2026
Current recordRecorded as completed
Proposed scale4 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

New sign installation on the first floor facade for commercial space as per plans filed herewith. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 1900, with 6 homes, on a 2,125 sq ft lot.

Built
1900
Last altered
1986
Floors
4
Residential units
6
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C1-9A
Lot area
2,125 sq ft
Building area
5,890 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01438934-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01438934-I1
BBL
1009390037
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4