NYC DOB record · M01462741-I1

344 East 85 Street

344 East 85 Street, Manhattan, NY 10028

Alteration filing in Upper East Side-Yorkville, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01462741-I1

344 East 85 Street

Manhattan, NY 10028

Alteration filing · status dated Oct 28, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
64
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01462741-I1 as a alteration filing at 344 East 85 Street, Manhattan, NY 10028. Its latest published status category is Approved, dated Oct 28, 2026. The filing records 6 proposed stories and 64 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 28, 2026
Proposed scale
6 proposed stories and 64 proposed dwelling units
Applicant of recordSee the 19 filings that name Honorio Designs Architecture, PLLC
FiledSep 22, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$17,850

What the filing says

A public-record reading of the proposed work.

Renovation of an existing apartment bathroom and installation of a washing machine in accordance with the filed plans. Modify vestibule flooring slope as required to provide an accessible transition. No change to use, occupancy, or means of egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1920, with 64 homes, on a 8,173 sq ft lot.

Built
1920
Last altered
1987
Floors
6
Residential units
64
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
8,173 sq ft
Building area
34,300 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01462741-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01462741-I1
BIN
1049970
BBL
1015470032
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
64
Proposed dwelling units
64
General construction