What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1970, with 268 homes, on a 99,855 sq ft lot.
- Built
- 1970
- Last altered
- 1985
- Floors
- 7
- Residential units
- 268
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 99,855 sq ft
- Building area
- 286,777 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 18 notices on file; the most recent was issued Dec 23, 2025.
- Construction
Issued Dec 23, 2025 — STRUCTURE RENDERED NON COMPLIANT. RESPONDING TO AN INCIDENT OBSERVED APPROXIMATELY 60' LINEAR FEET THAT HAD COLLAPSED FROM GARBAGE TRUCK IMPACT. OBSERVED SIDEWALK SHED DEBRIS AT SIDEWALK AND PARAPET PANEL HANGING WITH POTENTIAL TO FURTHER FALL.
- Hazardous condition (facade)
Issued Nov 16, 2023 — NYCHA CYCLE 9C UNSAFE REPORT FILED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01414036-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01414036-I1
- BIN
- 1079340
- BBL
- 1016730006
- Postal code
- 10029 · 218 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 269
- Proposed dwelling units
- 269