What the filing says
A public-record reading of the proposed work.
Interior renovation with partitions as per plan. no change in use, means of egress or occupancy in this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1908, with 8 homes, on a 2,649 sq ft lot.
- Built
- 1908
- Floors
- 4
- Residential units
- 8
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 2,649 sq ft
- Building area
- 8,040 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 8 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Sep 23, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348261 & VIO#050225PI30802HZ DATED 05/02/2025 REQUIRING OWNER TO PROV A CORRECTIVE ACTION PLAN FROM 30 DAYS OF DATE OF INSP START BLDG REPAIRS UNDER PERMIT BY 6/02/25 AS OF TODAY 9/23/25 A CAP & EVID OF COMPL REPAIR WORK WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 348261 & 050225PI30802HZ TO PROV CAP
- Construction
Issued May 2, 2025 — CORRECTION ACTION PLAN REQ'D.OBSV DISLODGE STONEHEADER ORNAMENTAL MOLDINGS & STONE CROWN AOVE WINDOWS,VERT CRACKED BRICKS,CRACKED STONE WINDOW SILLS @ EXP1 IN VATIOUS LOCATION FACING PROSPECT PL ADJ TO SIDEWALK POSING A DANGET TO PUBLIC.OWNER TO IMMED RETAIN NYS REG DESING PROF TO EVAL ENTIRE BLDG&SUBMIT CORRECTIVE ACTION PLAN
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00448886-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00448886-I1
- BIN
- 3028576
- BBL
- 3011530054
- Postal code
- 11238 · 2876 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 8
- Proposed dwelling units
- 8








