What the filing says
A public-record reading of the proposed work.
Interior renovation at select mobility units as part of the nycha pact renovation: direct replacement of finishes, kitchen, bathrooms, doors and windows; no changes to use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story elevator apartment building built in 1967, with 307 homes, on a 412,500 sq ft lot.
- Built
- 1967
- Floors
- 18
- Residential units
- 307
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R4
- Lot area
- 412,500 sq ft
- Building area
- 264,960 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 26 notices on file; the most recent was issued Jan 27, 2026.
- Construction
Issued Jan 27, 2026 — EMERGENCY WORK ORDER.BLDG WAS DMGD DUE TO GAS EXPLOSION ON 1/29/26 SEVERE DMGD NOTED@THE 16THH&17THFLS.WALLS OF PUBLIC HALLWAY PRTLLY CLLPSD.ELEVATOR SHAFT WALL BULGNG&CMPRMSD@16TH FL.UNDR DRCT&CONTINUOUS SPRVSN OF PE TO 1.SECURE THE DMDG SECTION OF THE HALLWAY W/PLYWOOD DOORS&LOCKS,2.EVAL DEMO/REBUILT
- Construction
Issued Jan 27, 2026 — FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES.ON 1/24/26,A FIR E INCIDENT OCCURED WHICH DISPLACED SECTION OF THE CAVITY WALL CONSTRUC TION.REMEDY:OWNER TO IMMEDIATELY RETAIN SERVICES OF NYS REG DESIGN PRO WITH QEWI CERT TO INSPECT AND EVALUATE 100% OF ENTIRE CAVITY WALL SYST EM(HANDS ON SOUND WITH PROBE)AT ALL EXPOSURES EXCEPT SECTIONS OF WALL
- Construction
Issued Jan 24, 2026 — STRUCTURE RENDERED NON COMPLIANT DUE TO EXPLOSION GAS AT 16TH & 17TH F LOORS STRUCTURAL STABILITY REQUESTED AT EXPOSURE #3 FACADE. LOOSE BRIC KS.& PARTIAL COLLAPSE. ...OWNER TO HIRE A NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV. WITHIN 7 DAYS ADDRESSING ALL CONDITI ONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME TO BE COMPLETED
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00884355-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00884355-S1
- BBL
- 2052630040
- Postal code
- 10475 · 50 filings
- Review type
- Professional Certification
- Existing stories
- 18
- Proposed stories
- 18
- Existing dwelling units
- 148
- Proposed dwelling units
- 148








