NYC DOB record · Q00455195-P4

35-20 24 Street

35-20 24 Street, Queens, NY 11106

Alteration filing in Queensbridge-Ravenswood-Dutch Kills, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00455195-P4

35-20 24 Street

Queens, NY 11106

Alteration filing · status dated Sep 28, 2026

Current record
Under review
Proposed scale
6 stories
Dwelling units
48
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00455195-P4 as a alteration filing at 35-20 24 Street, Queens, NY 11106. Its latest published status category is Under review, dated Sep 28, 2026. The filing records 6 proposed stories and 48 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 28, 2026
Proposed scale
6 proposed stories and 48 proposed dwelling units
Applicant of recordSee the 21 filings that name Liro Architects + Planners, P.C.
FiledSep 24, 2026
Current recordUnder review
Proposed scale6 stories
Recorded cost$133,200

What the filing says

A public-record reading of the proposed work.

Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1959, with 579 homes, on a 421,242 sq ft lot.

Built
1959
Floors
6
Residential units
579
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R5
Lot area
421,242 sq ft
Building area
502,525 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 4 notices on file; the most recent was issued Feb 22, 2022.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00455195-P4.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,995 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00455195-P4
BIN
4430712
BBL
4003350002
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
48
Proposed dwelling units
48
General construction