What the filing says
A public-record reading of the proposed work.
This job is filed for demolition of a one story building.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1928, on a 17,932 sq ft lot.
- Built
- 1928
- Last altered
- 1990
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- M1-4/R9
- Lot area
- 17,932 sq ft
- Building area
- 18,360 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jan 29, 2026.
- Construction
Issued Jan 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348414 VIO#121825PI40103SB DATED 12/18/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/18/2026. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/THE COMMISSIONER'S ORDER CONTROL#348414 AND CAP VIO # 121825PI40103SB
- Construction
Issued Dec 18, 2025 — CORRECTIVE ACTION PLAN REQ'D(30 DAY CAP)OBSVD @ EXP2 BULGING/CRACKED BRICK MASONRY. @ EXP3 ON 41 ST OBSV A MSONRY CRACK @ PARAPET & A SEVERELY DETERIORATED/SAGGING LINTEL. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 01/18/2026 ADDRESSING ALL CONDITIONS W/PLANS/PHOTOS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01302134-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01302134-I1
- BIN
- 4010880
- BBL
- 4006690013
- Postal code
- 11101 · 753 filings
- Review type
- Standard Plan Examination
- Existing stories
- 1
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source