NYC DOB record · Q01074608-I1

35-39 37 Street

35-39 37 Street, Queens, NY 11101

Alteration filing in Astoria (Central), Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01074608-I1

35-39 37 Street

Queens, NY 11101

Alteration filing · status dated Oct 21, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01074608-I1 as a alteration filing at 35-39 37 Street, Queens, NY 11101. Its latest published status category is Approved, dated Oct 21, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 21, 2026
Proposed scale
1 proposed story
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4620819Applicant of recordSee the 4 filings that name Jkrp Architects
FiledSep 24, 2024
Current recordApproved
Proposed scale1 stories
Recorded cost$3M

What the filing says

A public-record reading of the proposed work.

Filing for General construction modifications as per plans filed herewith. No change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story theatre built in 1998, on a 38,000 sq ft lot.

Built
1998
Floors
1
Residential units
0
Building type
Theatre
Land use
Commercial and office
Zoning district
M1-4/R7-3
Lot area
38,000 sq ft
Building area
37,625 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 22 notices on file; the most recent was issued Mar 26, 2026.

  • Construction

    Issued Mar 26, 2026 — EMERGENCY WORK ORDER. NOTE AS PER UNSAFE NOTIFICATION #UNPS-Q0006467-1 C-002.UNSAFE CONDITION IDENTIFIED AT THE SOUTHEAST SECTION OF THE ENTR ANCE RAMP. CMU WALL APP EARS IMPACTED DISPLACE AND OUT OF PLAN POSING A STRUCTURAL OVERHEAD HARAZ. REMEDY: INNEDIATELY RETAIN A NYS REG. DES IGH PROFESSIONAL WITH QPSI CERT. CONDUCT A FULL INSPECTION FOR THE ENT

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to

    Issued Jun 1, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01074608-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01074608-I1
BBL
4006410004
Review type
Professional Certification
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
General construction